Progress people progress. Finally!

Since I posted last last we found that when it rains water comes up through the foundations of the house (a lot of water). That meant that the bricks holding up the house were rotting away and had to be replaced. We also found that the house is sitting on clay (great for absorbing water) and the concrete sitting on top of that clay was only about an inch thick. What was I saying before about there not being anything else left to take up? I’ll know better for next time.

Oh also the woodworm found its way into the first part of the staircase so that has to be rebuilt also.

Pretty much all of the ground floor is being re-laid will a nice thick layer of concrete, damp proof course (essentially a huge plastic sheet) and engineered bricks (which are less likely to absorb water).

See “progress” pics below.

20131005-105522.jpg

20131005-105555.jpg

20131005-105729.jpg

20131005-105813.jpg

20131005-105840.jpg

20131005-105907.jpg

20131005-105940.jpg

20131005-110026.jpg

20131005-110051.jpg

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s